The project is part of the federal government’s efforts to modernize port infrastructure, expand the logistical capacity of the North region and strengthen the flow of Brazilian agricultural production to national and international markets.

BRAZIL – Brazil has signed a 25-year lease agreement with infrastructure company CS Infra SA for the MCP01 grain terminal at the Port of Santana, in Amapá state, with planned investments of R$150.2 million (US$30 million) to modernize facilities and strengthen the country’s agricultural export logistics.
Ports and Airports Minister Tomé Franca signed the contract on October 23, 2026, during a visit to the port.
The investment programme will include installing conveyor systems and a new shiploader, along with improvements to the terminal’s piers and landside infrastructure.
Additional works will cover paving, drainage, fire-protection systems and operational facilities to improve cargo handling and storage.
The terminal is designed primarily to handle solid agricultural bulk commodities, particularly soybeans and corn, as well as other suitable bulk cargoes.
CS Infra won the terminal lease at an auction held on February 26, 2026, organized by Brazil’s Ministry of Ports and Airports and the National Waterway Transportation Agency (ANTAQ).
The MCP01 facility covers approximately 30,546 square metres and has an estimated annual handling capacity of 1.2 million tonnes.
The new shiploader, planned to operate at up to 1,500 tonnes per hour, is expected to improve loading efficiency and allow the terminal to accommodate larger vessels.
Located along the Amazon River, the Port of Santana is an important export gateway for Brazil’s Northern Arc logistics corridor, which connects agricultural production areas in the country’s central-western region with international markets.
The corridor provides an alternative route for moving grain from inland production zones to overseas buyers, helping diversify export logistics and potentially reduce transportation costs.
The port handled about 3.6 million tonnes of cargo in 2025, up 13.54% from 2024.
Soybeans, wood, corn, soybean oil residues and manganese were among its principal cargoes.
Cargo movements reached 403,000 tonnes in January and February 2026, up 6.52% year-on-year, according to Brazil’s Ministry of Ports and Airports.
The MCP01 lease forms part of a broader modernization programme at Santana. Planned investments for the MCP01 and MCP03 terminal projects between 2023 and 2026 total R$239.1 million (US$44.68M).
A separate R$11.6 million (US$2.17M) project will upgrade approximately 1.2 kilometres of port access roads, with construction scheduled to begin in November 2026.
The investment is expected to strengthen Brazil’s grain export infrastructure, improve cargo-handling efficiency and support the movement of agricultural commodities to international markets.
Sign up to HERE receive our email newsletters with the latest news and insights from Africa and around the world, and follow us on our WhatsApp channel for updates.